Zerah’s Farm

Rhône Valley Varietals

Interior drywall installed

Interior drywall installed

I’ve finally covered the interior wall by gypsum board. This is the downstairs area, looking at the south facing door and half bath. You can see black, fire sprinkler pipe hanging from the ceiling and awaiting their sprinkler heads. My blow-up mattress sits by...
Move in day

Move in day

After finally settling in Bennett Valley for good, I indulged in my first meal. The constant back-and-forth trips from Southern California were taking their toll, and it was time to establish a permanent presence here. I needed to be fully committed to prepare...
Interior insulation progress

Interior insulation progress

With the completion of the exterior facade of the vineyard building, our attention quickly turned towards the interior. Before proceeding with the drywall, we tackled the electrical and plumbing installations, ensuring everything was in perfect order. As this image...
Rip and disk

Rip and disk

Prepare to witness the birth of a remarkable vineyard. Today, we embark on a transformative journey as we carefully rip and disk the soil.  Utilizing the recommendations of our vineyard and soil consultants, the machine only rips the soil 3 feet down. Gone are the...
Fauda, my dog-cat

Fauda, my dog-cat

Introducing my trusty construction companion, Fauda, a remarkable 22 lb Maine Coon cat. With his larger-than-life personality, he has stolen my heart as the coolest feline I’ve ever encountered. Here, you can catch him lounging in the front passenger seat of my...